British mining company Anglo Asian Mining (AAM), which develops gold deposits in Azerbaijan, increased silver production in the country by 27.3% year-on-year in Q3 2026, reaching 52,969 ounces. A year earlier, in Q3 2025, the figure stood at 41,623 ounces.

According to Anglo Asian Mining, as reported by FinFly, of the total output for July–September, 5,480 ounces of silver were contained in doré alloy, while 47,489 ounces were produced through flotation processing and the SART technology.

For the nine months of 2026, Anglo Asian increased silver production by 40.3% to 145,824 ounces (compared to 103,971 ounces for the nine months of 2025).

According to the company's confirmed forecast, silver production for the full year 2026 is expected to be in the range of 170,000 to 210,000 ounces.

Anglo Asian Mining plc is a copper and gold producer in Azerbaijan. The PSA-type contract was signed on August 21, 1997, and provided for the development of six deposits. Azerbaijan's share in the contract is 51%, and Anglo Asian Mining Plc. holds 49%. Currently, AAM owns the rights to develop eight contract areas in Azerbaijan.