Тема

Aghdam

Azerbaijani Railways: Aghdam–Khankendi Line 44% Complete
Transport

Azerbaijani Railways: Aghdam–Khankendi Line 44% Complete

Design work on the Aghdam–Khankendi railway line is 90% complete, with construction and installation at 44%. The 30.8 km line will include 130 engineering structures.

Zeyni JafarovJuly 31, 2026